Construction Inc.
  1. Home
  2. Services
  3. Bathroom Remodeling
Bathroom Remodeling

Bathroom Remodeling

From modern upgrades to luxury retreats, we handle it all.

Bathroom Remodeling

Waterproofing Is the Part Worth Paying For

Almost every failed bathroom we get called into failed the same way — water got behind the tile. That layer is invisible, it is not glamorous, and it is the difference between fifteen years and three.

We self-perform the waterproofing on every bathroom we build. Proper backing, correct slope to the drain, membranes lapped the right direction, and a water test before a single tile goes on.

After that comes the part you see: vanities set level, tile laid out so the pattern centers on the room, lighting that works for getting ready and not just for photos, and fixtures matched to the plumbing behind them.

Bathroom Remodeling project by Home Solutions Construction Bathroom Remodeling
Scope

What Is Included

  • Full gut bathroom remodels
  • Curbless and barrier-free walk-in showers
  • Complete waterproofing systems, water tested
  • Tub-to-shower conversions
  • Vanities, counters and custom storage
  • Fixture relocation, venting and plumbing corrections
  • Heated floors, exhaust upgrades and lighting
  • Accessibility work — grab bars, ramps, wider doorways

Typically a Good Fit For

  • Leaking or failing showers
  • Tubs nobody uses
  • Aging-in-place conversions
  • Small baths that need a smarter layout

Not sure this is what you need?

Call and describe the project. If it is not something we do, we will point you to someone who does it well.

(805) 406-2911
Drag to Compare

Before & After

Slide the handle to see the difference. Stock imagery for now — real project photography is being swapped in.

Bathroom Remodeling after Bathroom Remodeling before Bathroom Remodeling Before After
Budget

What Drives Your Price

We price every project individually after walking the space — so rather than publish numbers that would not apply to your home, here is what actually moves the total, and how to compare bids fairly.

Your estimate is free, written and line-item. We walk the space, measure, and put every line in writing with allowances stated in dollars so you can raise or lower them yourself. No obligation, and no number scribbled on the back of a business card.

What Moves the Number

  • Whether the shower stays where it is or moves
  • Tile size and pattern — large-format and herringbone take far more labor
  • Whether you need a curbless entry, which means altering the floor structure
  • Fixture level, from builder-grade to designer brass
  • Old galvanized or cast-iron plumbing that has to be replaced while it is open
  • Hidden rot behind a shower that has been leaking quietly

How to Compare Bids Fairly

A low bid is often just a smaller scope. When you compare estimates, check that each one includes permits, the same allowances, debris removal, and the same level of demolition. Ask every contractor what happens when they find something unexpected — the answer tells you more than the number does.

Verify any license at cslb.ca.gov before you sign anything. Ours is #1125128.

Schedule

How Long It Takes

Real durations from our own jobs. Permitting is the phase most homeowners underestimate — it is controlled by the building department, not by us.

Typical schedule — Bathroom Remodeling
PhaseTypical durationWhat happens
Consult & measure1 dayWe look at the existing shower, subfloor and venting, and talk realistic scope.
Design & selections1–3 weeksLayout, tile and fixture selections locked before demo starts.
Permits2–5 weeksRequired whenever plumbing moves or walls change.
Demo2–3 daysEverything out, subfloor and framing inspected for damage.
Rough-in & inspection3–5 daysPlumbing, electrical and venting set, then inspected before we close anything.
Waterproofing2–3 daysBacker, membrane, slope and a flood test on the pan.
Tile & finish1–2 weeksTile, grout, vanity, fixtures, glass, paint and final walkthrough.
Choices

Materials & Options

A starting menu, not a limit. If you want something that is not on here, ask.

Showers

  • Curbless barrier-free entry
  • Low-curb walk-in
  • Tub-to-shower conversion
  • Frameless glass enclosures
  • Built-in niches and benches
  • Rain heads and hand showers

Surfaces

  • Porcelain and ceramic tile
  • Natural stone and marble
  • Large-format slab walls
  • Heated tile floors
  • Quartz vanity tops
  • Waterproof LVP flooring

Accessibility

  • Blocking for future grab bars
  • Comfort-height toilets
  • Wider doorways
  • Roll-in shower thresholds
  • Hand-held fixtures on slide bars
  • Non-slip tile selection
Where We Work

Bathroom Remodeling on the Central Coast

We remodel bathrooms across Santa Maria, Orcutt, Nipomo, Lompoc and Santa Barbara. Older housing stock here often hides galvanized supply lines and cast-iron drains behind the tile — we plan for that instead of being surprised by it.

Local guides: Santa Maria · Orcutt · Santa Barbara

See every area we serve
15+Years Experience
100+5-Star Reviews
BLicense Class
1 DayResponse Time

Licensed, Bonded, Insured

CSLB #1125128 · General Building (Class B) · $25,000 bond · general liability and workers’ compensation. Certificates come with every proposal without you having to ask.

How It Goes

What Working With Us Looks Like

Consult

We walk the property, listen, and talk budget honestly before anything gets drawn.

Design & Bid

Drawings, selections and a written line-item estimate.

Permits

We submit, handle corrections and schedule every inspection.

Build

Weekly photo updates and a schedule you can hold us to.

Walkthrough

Punch list built with you, warranty handed over, site left clean.

FAQ

Bathroom Remodeling — Questions

How long does a bathroom remodel take?

A full gut on a standard bathroom is usually 4 to 6 weeks including inspection hold points. Tile and fixture lead times can add to that, so we lock selections early.

Can you make a bathroom accessible for aging in place?

Yes — curbless showers, blocking for grab bars, comfort-height fixtures, wider doorways and ramps. Building the blocking in now costs very little and saves a demo later.

Do you handle the waterproofing yourselves?

Yes. It is the single most common failure point in a bathroom, so we never subcontract it. We water test the pan and have it inspected before tile goes on.

What if you find rot or mold behind the wall?

On older homes it happens. We stop, photograph it, and bring you the repair options with prices before continuing. Nothing gets billed that you did not approve first.

Is a curbless shower worth it?

If you plan to stay in the house, yes. It looks better, it is far easier to clean, and it means you never have to renovate again for mobility reasons. It does require altering the floor framing, so it is not the cheapest option.

Can we only use one bathroom during the remodel?

If it is your only bathroom we will tell you that up front and sequence the work to minimize the days it is out of service. For a second bathroom, it is usually a non-issue.

Also From Us

Other Services

Kitchen Remodeling

Custom kitchens designed for beauty, function, and your lifestyle.

Learn more

Roofing

High-quality roofing solutions built to protect your home.

Learn more

ADUs

Custom ADUs for extra space, rental income, or multi-generational living.

Learn more

Full Home Remodels

Complete renovations from concept to completion.

Learn more
Call Us
Free Estimates
Fast & Easy
Service Area
Santa Maria | Orcutt |
Santa Barbara County
Get Your Free Estimate
Call Now Free Estimate