Kitchen Remodeling
Custom kitchens designed for beauty, function, and your lifestyle.
Learn moreRoom-by-room over ten years costs more than doing it once. It also means living in a construction zone on and off for a decade.
A whole-home remodel is the one chance to fix everything at once — the layout that never worked, the panel that is maxed out, the galvanized plumbing, the windows that leak heat, the framing somebody hacked through in 1978.
We manage the whole thing under one contract: design, permits, every trade, inspections and finishes. You get one project manager, one schedule with real milestone dates, and a weekly update with photos.
Full Home Remodels
Call and describe the project. If it is not something we do, we will point you to someone who does it well.
(805) 406-2911Slide the handle to see the difference. Stock imagery for now — real project photography is being swapped in.
Full Home Remodels
Before
After
We price every project individually after walking the space — so rather than publish numbers that would not apply to your home, here is what actually moves the total, and how to compare bids fairly.
A low bid is often just a smaller scope. When you compare estimates, check that each one includes permits, the same allowances, debris removal, and the same level of demolition. Ask every contractor what happens when they find something unexpected — the answer tells you more than the number does.
Verify any license at cslb.ca.gov before you sign anything. Ours is #1125128.
Real durations from our own jobs. Permitting is the phase most homeowners underestimate — it is controlled by the building department, not by us.
| Phase | Typical duration | What happens |
|---|---|---|
| Consult & walkthrough | 1–2 days | Full property walk, structural first look, honest budget conversation. |
| Design & engineering | 6–12 weeks | Architectural drawings, structural engineering, Title 24, selections schedule. |
| Permitting | 6–16 weeks | Full plan check with corrections. Longest and least predictable phase. |
| Demo & structural | 3–6 weeks | Interior demo, framing changes, beams, foundation repair if needed. |
| Rough-in & inspections | 4–8 weeks | Electrical, plumbing, mechanical, then insulation and drywall. |
| Finishes | 8–16 weeks | Cabinets, counters, tile, flooring, trim, paint, fixtures. |
| Punch & closeout | 2–3 weeks | Punch list built with you, final inspections, warranty handoff. |
A starting menu, not a limit. If you want something that is not on here, ask.
We take whole-home projects across Santa Maria, Orcutt, Nipomo, Arroyo Grande, Lompoc and Santa Barbara. A lot of the housing stock here was built between the 1950s and 1980s, which means we plan for aluminum wiring, galvanized supply and under-insulated walls as the norm rather than the exception.
Local guides: Santa Maria · Orcutt · Santa Barbara
See every area we serveCSLB #1125128 · General Building (Class B) · $25,000 bond · general liability and workers’ compensation. Certificates come with every proposal without you having to ask.
We walk the property, listen, and talk budget honestly before anything gets drawn.
Drawings, selections and a written line-item estimate.
We submit, handle corrections and schedule every inspection.
Weekly photo updates and a schedule you can hold us to.
Punch list built with you, warranty handed over, site left clean.
For a true whole-house gut, moving out is usually faster and cheaper than working around you. For phased work we build dust walls and keep a bathroom and kitchen functional. We will be straight with you about which makes sense.
Most run 4 to 8 months of construction, plus design and permitting ahead of that. You get milestone dates in the contract, not a vague range.
Our proposals carry a stated contingency because older homes always have something. When we find it, you get photos and priced options the same day.
Both ways. We work alongside yours, or bring in ours. Either way you get a selections schedule with deadlines so the project never stalls waiting on a tile decision.
Honest answer: sometimes selling wins. If the layout is fundamentally wrong, the lot is the problem, or the numbers do not pencil, we will say so. We would rather lose the job than build you something you regret.
A deposit within California's legal limit, then progress payments tied to completed milestones — not to dates on a calendar. You never pay for work that has not been done.
Custom kitchens designed for beauty, function, and your lifestyle.
Learn moreFrom modern upgrades to luxury retreats, we handle it all.
Learn moreHigh-quality roofing solutions built to protect your home.
Learn moreCustom ADUs for extra space, rental income, or multi-generational living.
Learn more