Construction Inc.
  1. Home
  2. Services
  3. Kitchen Remodeling
Kitchen Remodeling

Kitchen Remodeling

Custom kitchens designed for beauty, function, and your lifestyle.

Kitchen Remodeling

The Room Your Whole House Runs Through

A kitchen carries more plumbing, more electrical and more daily wear than any other room. Most of what you pay for is work you will never see again.

We start with how you actually use the room — who cooks, where people stand, what never had enough space. Then we build the layout around that instead of around where the old pipes happened to run.

Walls come out where they should, with engineered beams and permits. Circuits get sized for real appliances. Cabinets go in dead level so the drawers still line up years from now, and tile layout is planned so cut pieces land where nobody looks.

Kitchen Remodeling project by Home Solutions Construction Kitchen Remodeling
Scope

What Is Included

  • Full gut kitchen remodels, down to the studs
  • Load-bearing wall removal for open-concept layouts
  • Cabinetry — stock, semi-custom and fully custom
  • Countertop templating and installation
  • Dedicated appliance circuits and panel upgrades
  • Plumbing relocation, gas lines and vent corrections
  • Recessed, under-cabinet and pendant lighting
  • Tile, backsplash, flooring and finish carpentry

Typically a Good Fit For

  • Closed-off galley layouts
  • Kitchens from the 80s and 90s
  • Homes with undersized electrical panels
  • Anyone tired of not enough counter space

Not sure this is what you need?

Call and describe the project. If it is not something we do, we will point you to someone who does it well.

(805) 406-2911
Drag to Compare

Before & After

Slide the handle to see the difference. Stock imagery for now — real project photography is being swapped in.

Kitchen Remodeling after Kitchen Remodeling before Kitchen Remodeling Before After
Budget

What Drives Your Price

We price every project individually after walking the space — so rather than publish numbers that would not apply to your home, here is what actually moves the total, and how to compare bids fairly.

Your estimate is free, written and line-item. We walk the space, measure, and put every line in writing with allowances stated in dollars so you can raise or lower them yourself. No obligation, and no number scribbled on the back of a business card.

What Moves the Number

  • Whether walls move — structural work is the single biggest line item
  • Cabinetry level: stock, semi-custom or shop-built custom
  • Counter material — laminate to quartz to natural stone is a wide spread
  • Whether plumbing and gas have to move
  • Panel capacity — older Santa Maria homes often need an upgrade
  • What we find when the walls open: rot, old wiring, failed subfloor

How to Compare Bids Fairly

A low bid is often just a smaller scope. When you compare estimates, check that each one includes permits, the same allowances, debris removal, and the same level of demolition. Ask every contractor what happens when they find something unexpected — the answer tells you more than the number does.

Verify any license at cslb.ca.gov before you sign anything. Ours is #1125128.

Schedule

How Long It Takes

Real durations from our own jobs. Permitting is the phase most homeowners underestimate — it is controlled by the building department, not by us.

Typical schedule — Kitchen Remodeling
PhaseTypical durationWhat happens
Consult & measure1 dayWe walk the kitchen, measure, photograph and talk budget honestly.
Design & selections2–4 weeksLayout drawings, cabinet order, and a selections schedule with deadlines.
Permits2–6 weeksSubmitted to the city or county. Runs parallel to cabinet lead time.
Demo & rough-in1–2 weeksCabinets out, walls opened, plumbing and electrical moved, inspections called.
Drywall & paint1 weekPatch, texture to match, prime and paint.
Cabinets & counters2–3 weeksCabinets set and leveled, then counters templated and installed a week later.
Tile, trim & punch1–2 weeksBacksplash, flooring, hardware, appliances, final inspection and walkthrough.
Choices

Materials & Options

A starting menu, not a limit. If you want something that is not on here, ask.

Cabinetry

  • Stock — fastest, most affordable
  • Semi-custom — the usual sweet spot
  • Full custom shop-built
  • Refacing existing boxes
  • Soft-close everything
  • Interior organizers and pull-outs

Counters

  • Quartz — most popular, low maintenance
  • Granite and natural stone
  • Butcher block accents
  • Porcelain slab
  • Waterfall island edges
  • Full-height slab backsplash

Everything else

  • LED recessed and under-cabinet
  • Pot filler and instant hot water
  • Induction and gas ranges
  • Vent hoods ducted to exterior
  • LVP, tile or hardwood floors
  • Pantry and coffee-bar build-outs
Where We Work

Kitchen Remodeling on the Central Coast

Most of our kitchens are within twenty minutes of the shop — Santa Maria, Orcutt, Nipomo and Guadalupe — with regular work down through Lompoc, Buellton and Santa Barbara. We know which plan checkers want what, and we know the cabinet and stone suppliers on the Central Coast by name.

Local guides: Santa Maria · Orcutt · Santa Barbara

See every area we serve
15+Years Experience
100+5-Star Reviews
BLicense Class
1 DayResponse Time

Licensed, Bonded, Insured

CSLB #1125128 · General Building (Class B) · $25,000 bond · general liability and workers’ compensation. Certificates come with every proposal without you having to ask.

How It Goes

What Working With Us Looks Like

Consult

We walk the property, listen, and talk budget honestly before anything gets drawn.

Design & Bid

Drawings, selections and a written line-item estimate.

Permits

We submit, handle corrections and schedule every inspection.

Build

Weekly photo updates and a schedule you can hold us to.

Walkthrough

Punch list built with you, warranty handed over, site left clean.

FAQ

Kitchen Remodeling — Questions

How long does a kitchen remodel take?

A cosmetic refresh runs about 3 to 5 weeks. A full gut with layout changes and structural work is typically 7 to 12 weeks on site. Cabinet lead times usually drive the schedule, so we order those first.

What does a kitchen remodel cost around here?

The ranges above cover most Central Coast kitchens, but scope and finish level move the number a lot. We walk your kitchen and hand you a written line-item estimate with allowances you can raise or lower — free, no obligation.

Will I be without a kitchen the whole time?

Only for the middle stretch. We help set up a temporary kitchen with the fridge, microwave and a sink, and we sequence cabinets and counters to keep that window as short as possible.

Do I need a permit to remodel my kitchen?

If you are moving plumbing, adding circuits or taking out a wall, yes. We pull the permit with the City of Santa Maria or Santa Barbara County and schedule every inspection ourselves.

Can you remove the wall between my kitchen and living room?

Usually. If it is load-bearing we bring in a structural engineer, size a beam, and permit it properly. That is the most common request we get and it is very doable — it just is not a weekend job.

Can I supply my own cabinets or appliances?

Yes, and plenty of clients do. We will tell you honestly where owner-supplied material saves money and where it creates warranty gaps or scheduling risk.

Also From Us

Other Services

Bathroom Remodeling

From modern upgrades to luxury retreats, we handle it all.

Learn more

Roofing

High-quality roofing solutions built to protect your home.

Learn more

ADUs

Custom ADUs for extra space, rental income, or multi-generational living.

Learn more

Full Home Remodels

Complete renovations from concept to completion.

Learn more
Call Us
Free Estimates
Fast & Easy
Service Area
Santa Maria | Orcutt |
Santa Barbara County
Get Your Free Estimate
Call Now Free Estimate